top of page
1517006879176.jfif

CV-M.BERTOLDO

Company owner

Education, work and training

CAD Designer

PMT Italia SpA

July 2001 - January 2007

Design of auxiliary equipment installation in a paper mill:
1: Layout definition for all auxiliaries required for a correct operation of a paper machine;
2: design of utilities networks: water, compressed air, vacuum and mixture (from the plant diagram
definition to 3D designs of piping, to the list of materials and construction drawings of piping);
3: design of the foundation details of the machinery;
4: assistance during on-site installation.

Commercial technician

Sirmen s.r.l.

January 2007 - March 2009

1: logistics management for importing engine components from India to Iveco.
2: employed as an external consultant at the LH&A department at Fiat Powertrain Technologies facility in Turin: technical consultancy for development of layouts for new production lines for a new
transmission for passenger cars at the FPT plants of Turin and Verrone (BI). Within this projects I worked on: develop preliminary layouts and cost estimates for the purchase of automation; check of
cycle time of automation equipment used; at Verrone plant, management of personnel working on placement and installation of machinery.
3: at FPT Termoli (CB) and Iveco Turin plants, design of layouts for upgrading of some production lines.

CAD designer - Use and maintenance manuals updating

Teknoalfa s.r.l.

March 2009 - March 2010

Production of use and maintenance manual of gantry robots and conveyor belts according to the specifications and any special requirements of the end customer.

Mechanical engineering and technical support

ARIS S.p.A.

March 2010 - June 2011

1. Preparation of use and maintenance manuals for Army or Air Force vehicles in accordance with the specifications and any special requirements of the end customer. This activity included information
gathering from designers, workers and any other person involved in vehicles design and manufacturing
2. Responsible for the design, manufacturing and startup of the first prototype of an innovative system for the production of electricity from sea wave motion.

Process engineer
Fiat Chrysler Automobiles

June 2011-December 2015

Process engineer for the Layout, Handling & Automation department.
The LH&A department were involved in:
â–ª new installation or replacing of complete manufacturing lines or single machines;
â–ª relocation of complete or part of production department;
â–ª purchasing of automation (conveyors, robots, toolings)used to transfer materials between each production steps.

Process engineering
1. Preparation of technical specification for each intervention;
2. Plant layout of the line before and after the intervention;
3. Technical comparisons of proposals received;
4. Inspections with suppliers to plan in detail the activities;
5. Technical assistance on suppliers' site during the execution of each activity.

Machinery design and Industrialization
Freudenberg Sealing Technologies

December 2015-August 2018

Project Management
â–ª Detailed study of technical specification of the project, planning of all activities included in the project, from first machine concept, until machine acceptance at customer plant;
â–ª Daily monitoring of project progress and costs and reporting to machine engineering manager.
â–ª Purchase of materials required to produce machinery;
â–ª Daily check of machine engineering and building activities of the project to ensure that everything complies with technical contents required by project specification.
â–ª Gathering of information useful to feed the work of the designers involved in my projects.
â–ª Coordination of design resources involved on my project, along with other project managers, to ensure proper continuation of the activities of each project.
â–ª Technical support to all people involved in the project, from purchasers to mechanical/electrical designers and workers, software developers and, finally, to final users of machines.


Mechanical Engineering
â–ª Detailed study of technical specification of the project;
â–ª Prearation of machine concepts and meeting with mechanical engineering manager, to choose the final configuration to be followed for each machine;
â–ª Detailed mechanical engineering of machines, preparation of manufacturing drawings and BOMs;
â–ª Material purchasing;
â–ª Technical support to people involved in machine building;including installation of some mechanical subassemblies.

Mechanical engineer/project manager
Artimpianti Foundry Solutions

August 2018-September 2020

Project Management
â–ª Detailed study of technical specification of the project, planning of all activities included in the
project, from first machine concept, until machine acceptance at customer plant;
â–ª Daily monitoring of project progress and costs and reporting to machine engineering manager.
â–ª Purchase of materials required to produce machinery;
â–ª Daily check of machine engineering and building activities of the project to ensure that everything
complies with technical contents required by project specification.
â–ª Gathering of information useful to feed the work of the designers involved in my projects.
â–ª Coordination of design resources involved on my project, along with other project managers, to
ensure proper continuation of the activities of each project.
â–ª Technical support to all people involved in the project, from purchasers to mechanical/electrical
designers and workers, software developers and, finally, to final users of machines.

Mechanical Engineering
â–ª Detailed study of technical specification of the project;
â–ª Prearation of machine concepts and meeting with mechanical engineering manager, to choose the
final configuration to be followed for each machine;
â–ª Detailed mechanical engineering of machines, preparation of manufacturing drawings and BOMs;
â–ª Material purchasing;
â–ª Technical support to people involved in machine building;including installation of some mechanical
subassemblies.

Mechanical assembly and installation of machine parts.

Mechanical engineer/projectmanager
Aisi s.r.l. 

October 2020 - July2021

Company Owner
B.Projects

July 2021-Today

Progettazione meccanica macchine utensili ed automazione

bottom of page